Gnutella Forums  

Go Back   Gnutella Forums > Current Gnutella Client Forums > LimeWire+WireShare (Cross-platform) > Getting Started Using LimeWire + WireShare
Register FAQ The Twelve Commandments Members List Calendar Arcade Find the Best VPN Today's Posts

Getting Started Using LimeWire + WireShare Tips on getting started with LimeWire or WireShare. Also a place to seek help getting started. Includes the original LimeWire Pirate Edition thread, with the most up to date LPE installer packages on the internet including File_Girl's LPE version, and WireShare the most upgraded version of them all.


Reply
 
LinkBack Thread Tools Display Modes
  #1 (permalink)  
Old June 11th, 2008
Novicius
 
Join Date: June 11th, 2008
Posts: 2
tupacferret is flying high
Default hi help (buttons missing in setup wizard)

hi ive just downloaded [basic] to get started to see wot its like ,and of course first use means i get the set up boxes ,well the folder destination is ok then the auto start and broadband,and controls well that ticks next too but when it comes to the box with the extensions in ,no matter what i do it has no next or finish box in it so im then at a dead end as to continue,
ive even uninstalled and reinstalled limewire but its still the same am i being thick or is there a problem ,im getting fed up now please advise john
Reply With Quote
  #2 (permalink)  
Old June 11th, 2008
birdy's Avatar
Airhead
 
Join Date: October 18th, 2004
Location: Perth, Australia
Posts: 901
birdy has a distinguished reputationbirdy has a distinguished reputation
Default

Try clicking on the bottom of the setup wizard box & dragging it downwards...do the buttons show?

If that doesn't help, try the tips here: setup freezes
Reply With Quote
  #3 (permalink)  
Old June 13th, 2008
Novicius
 
Join Date: June 11th, 2008
Posts: 2
tupacferret is flying high
Default

hi tried everything now the second box[broadband/auto start has no next/finixsh buttons and also twice its gone straight to the box where i click on i wont use limewire for copyright stuff but when i click button it does nothing at all ,but i dont think the words are highlighted but are a dull colour,so now im pissed off and going bk to bearshare at least i could use that
ive tried to email limewire to moan about tech support and lack off it in fact ive only had your reply off here so i see it all as a waste of time thanx anyway john
Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 07:32 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.
SEO by vBSEO 3.6.0 ©2011, Crawlability, Inc.

Copyright © 2020 Gnutella Forums.
All Rights Reserved.