Gnutella Forums  

Go Back   Gnutella Forums > Current Gnutella Client Forums > LimeWire+WireShare (Cross-platform) > Getting Started Using LimeWire + WireShare
Register FAQ The Twelve Commandments Members List Calendar Arcade Find the Best VPN Today's Posts

Getting Started Using LimeWire + WireShare Tips on getting started with LimeWire or WireShare. Also a place to seek help getting started. Includes the original LimeWire Pirate Edition thread, with the most up to date LPE installer packages on the internet including File_Girl's LPE version, and WireShare the most upgraded version of them all.


 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1 (permalink)  
Old June 12th, 2008
Novicius
 
Join Date: June 11th, 2008
Posts: 1
hassey is flying high
Default cannot view videio

hello, my name is jim i have windows xp. i purchased and downloaded lime wire pro. i can download and listen to music i can also download videio but cannot veiw once downloaded. i receive a message saying file has an extension that does not match the file format then it sends me to a web site that does no good. iam a newby and somewhat illiterate when it come to computers. could someone please help with this problem? thank you
Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 05:10 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.
SEO by vBSEO 3.6.0 ©2011, Crawlability, Inc.

Copyright © 2020 Gnutella Forums.
All Rights Reserved.