Gnutella Forums  

Go Back   Gnutella Forums > Current Gnutella Client Forums > LimeWire+WireShare (Cross-platform) > Getting Started Using LimeWire + WireShare
Register FAQ The Twelve Commandments Members List Calendar Arcade Find the Best VPN Search Today's Posts Mark Forums Read

Getting Started Using LimeWire + WireShare Tips on getting started with LimeWire or WireShare. Also a place to seek help getting started. Includes the original LimeWire Pirate Edition thread, with the most up to date LPE installer packages on the internet including File_Girl's LPE version, and WireShare the most upgraded version of them all.


 
 
LinkBack Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #2 (permalink)  
Old June 12th, 2008
birdy's Avatar
Airhead
 
Join Date: October 18th, 2004
Location: Perth, Australia
Posts: 901
birdy has a distinguished reputationbirdy has a distinguished reputation
Default

In LW's library, right click on the column header & tick 'last modified'. Now you'll see a 'last modified' column in the library & you can click on that to show the most recent downloads first.
Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -7. The time now is 10:02 PM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.
SEO by vBSEO 3.6.0 ©2011, Crawlability, Inc.

Copyright © 2020 Gnutella Forums.
All Rights Reserved.